6
All Rights Reserved. 2017
Sky
Vue
®
Assembly Manual-
In ground Post
Once your concrete is mixed, have
a friend assist you with pouring.
Pour the concrete mixture to fill
the hole.
Pour slowly and evenly until
concrete mix has reached
ground level.
Once the mixture has been poured
into the hole gather the short post
sleeve to be inserted in the next
step.
Concrete Set up
Summary of Contents for IGP-32
Page 1: ...In Ground Post Assembly Manual NXG 32 NXG 42 NXG 46 In Ground Post...
Page 2: ......
Page 3: ...In Ground Post Setup...
Page 4: ......
Page 11: ...Notes...
Page 12: ......
Page 13: ...Post Tilt Mount Assembly NXG 3250 NXG 4250 NXG 4650...
Page 14: ......
Page 18: ...16 All Rights Reserved 2017 SkyVue Assembly Manual Post Tilt Mount...