8
All Rights Reserved. 2017
Sky
Vue
®
Assembly Manual-
In ground Post
With the concrete base set and hardened your post can now be mounted
over the top of the sleeve. Do this by sliding the post down over the
sleeve as shown.
After you position the post insert the swivel locking handle at the hole
located at the lower end of the mounting post.
Congratulations you are now finished with the concrete and post set up
portion of this installation. If you have any questions feel free to contact
our technical support team at
(877) 475-9883, option 2.
Summary of Contents for IGP-32
Page 1: ...In Ground Post Assembly Manual NXG 32 NXG 42 NXG 46 In Ground Post...
Page 2: ......
Page 3: ...In Ground Post Setup...
Page 4: ......
Page 11: ...Notes...
Page 12: ......
Page 13: ...Post Tilt Mount Assembly NXG 3250 NXG 4250 NXG 4650...
Page 14: ......
Page 18: ...16 All Rights Reserved 2017 SkyVue Assembly Manual Post Tilt Mount...