background image

15

P

ost

 t

ilt

 M

ount

nXG 3250 / nXG 4250 / nXG 4650 

U-Bolts and  

Mounting Plate Assembly:

U-Bolts should be hooked around the post and through the holes like 
shown with the arrows above, on the U-Bolt Saddles. These should be 
positioned near the upper cable entry hole.

With U-Bolts and saddles in place, 
slide mounting plate over the U-bolt 
ends.

U-Bolt

Post

Saddle

Top View

Summary of Contents for IGP-32

Page 1: ...In Ground Post Assembly Manual NXG 32 NXG 42 NXG 46 In Ground Post...

Page 2: ......

Page 3: ...In Ground Post Setup...

Page 4: ......

Page 5: ...d post Setup 1 Shovel 2 Post Hole Digger 3 Wheelbarrow and Garden Hoe For mixing concrete 4 Bag of Concrete Mix Amount of concrete will vary additional bags may be needed to complete this installation...

Page 6: ...on your location of install depth can or may need to be determined by the frost line of that area Please check frost concentration in your location before installing your in ground post Once the hole...

Page 7: ...may require 3 Using the Garden Hoe mix the concrete by scooping and brushing back and forth Mix till the concrete is nice and thick A good mix should hold its shape without dripping or crumbling apar...

Page 8: ...e is mixed have a friend assist you with pouring Pour the concrete mixture to fill the hole Pour slowly and evenly until concrete mix has reached ground level Once the mixture has been poured into the...

Page 9: ...er top of the flange and proceed to smooth the surface of the concrete mixture Make sure to remove any concrete above the flange as it will conflict with the rest of the installation process Once thin...

Page 10: ...by sliding the post down over the sleeve as shown After you position the post insert the swivel locking handle at the hole located at the lower end of the mounting post Congratulations you are now fi...

Page 11: ...Notes...

Page 12: ......

Page 13: ...Post Tilt Mount Assembly NXG 3250 NXG 4250 NXG 4650...

Page 14: ......

Page 15: ...ly assembled post Deck Post In ground Post or Portable Cart 2 2 U Bolts 4 Flat Washers 4 Lock Washers 4 Powder Coated Nuts 3 2 U Bolt Saddles 4 4 Rubber Bolt Caps 5 Appropriately sized tilt mount Loca...

Page 16: ...PTM Assembly Tilt Mounts See below for the appropriate sizes Ratchet with 9 16 Socket 9 16 32 Class Televisions or 42 46 Class Televisions PTM Boxes will contain the following items 2 Mounting Arms 1...

Page 17: ...U Bolts should be hooked around the post and through the holes like shown with the arrows above on the U Bolt Saddles These should be positioned near the upper cable entry hole With U Bolts and saddl...

Page 18: ...16 All Rights Reserved 2017 SkyVue Assembly Manual Post Tilt Mount...

Page 19: ...bolt ends 2 Place stainless steel lock washers over bolt ends 3 Thread black powder coated nuts over bolt ends and hand tighten See figure 3a for suggested mounting plate placement 4 Once positioned...

Page 20: ...ce the ABS washer on the thread side of the bolt 3 Place the lock washer on the thread side of the bolt 4 Place then twist the knob on to the bolt Do not tighten all the way this will control the amou...

Page 21: ...3250 NXG 4250 NXG 4650 Lay television down viewing side down on blanket Lay blanket down on flat sturdy surface Run hand over surface to make sure there are no sharp objects or protrusions when layin...

Page 22: ...e 4 screws and washers as indicated with the red circles Align holes of the mounting arms with the holes on the back of the television Reinsert the screws and washers from previous step and tighten se...

Page 23: ...is set correctly for the television Once the television is hung on the plate Be sure to tighten the position set screws on the bottom of the mounting arm to secure the television in HOOK SECURE BY TI...

Reviews: