27
To install the sleeve assembly, remove the mounting bolts from the Sleeve Assembly, install the sleeve
into the Base Frame as shown in Figure 8, and tighten Mounting Bolts being careful not to over-tighten
the bolts and crush the tubes.
Figure 8, Assembled Base Frame / Sleeve
The Sleeve Assembly may be moved side to side if required to adjust the davit position around site
obstacles.
Figure 7, Range of Opening Sizes for Jackpod Base Portable
By angling the base legs, position the base around the opening being entered so as to achieve the best
access to the opening for the entrant, and the best working position for the attendant.
Level the Base Assembly using the 4 Leveling Screws, adjusting the base such that the legs angle slightly
upwards as the go from back to front.
1371,6 mm (54 “)
1905 mm (75 “)
EN
Summary of Contents for Jackpod Davit
Page 2: ...2 ...
Page 32: ...32 Figure 12 Jackpod Davit System Labels EN ...
Page 48: ...48 Figura 12 Adesivi del sistema a gru IT ...
Page 81: ...81 Figura 12 Etiquetas del sistema del pescante ES ...
Page 114: ...114 Afbeelding 12 labels hijsarm NL ...
Page 130: ...130 Figur 12 mærkater for Jackpod Davit system DA ...
Page 145: ...145 Figur 12 Jackpod Davit systemets etiketter NO ...
Page 161: ...161 Kuva 12 taavettijärjestelmän kilvet FI ...
Page 177: ...177 Bild 12 Etiketter på lyftarmen SE SE ...
Page 192: ...192 Şekil 12 Matafora Sistem Etiketleri TR TR ...
Page 197: ...197 ...
Page 198: ......