![sitrex TR/11 Assembly, Use And Maintenance Download Page 9](http://html1.mh-extra.com/html/sitrex/tr-11/tr-11_assembly-use-and-maintenance_1285860009.webp)
8
4) Delivery and assembly
Delivery and unpacking
The machine is delivered partially assembled in 1 (one) box containing 6 (six) boxes and 1
(one) pallet. The boxes "A", "B", “C”, ”D”, ”E”, and “F” are all the various mounting
accessories
(pins,
screws, fittings,
etc..)
All components
are inspected
by the
manufacturer before shipment. Upon receipt of the machine, ensure that the case is intact
and that the contents have not been damaged during transport. If you detect damage and
/ or anomalies immediately report the matter to your vendor.
Note: The packaging is made from wood, plastic film, cardboard and steel, and must
be disposed of according to applicable laws in your locality.
To
unpack
the boxes received by
using suitable lifting is to
lift
the weight
given to the banks to bring stability to the pallets because of their size and shape.
Each machine arrives packed in one crate and one pallet
Summary of Contents for TR/11
Page 1: ...ASSEMBLY USE AND MAINTENANCE HAY RAKE PULL TYPE TR 11 13 S ...
Page 29: ...28 Step 19 ...
Page 30: ...29 Step 19 ...
Page 33: ...32 Step 21 ...
Page 37: ...36 6 GENERAL MAINTENANCE INSTRUCTIONS ...
Page 39: ...38 ...