21
Step 12
Step 12
Connect the tie rod 1 to the fixed arms A and B using the bolts 2 and nuts 3.
Connect cylinder 4 fastening the bottom at point C with pin 5, washer 6 and nut 7,
the head at point D with pin 8, washer 6 and nut 7.
IMPORTANT
Now fully tighten all bolts left loose in the preceding steps.
In this step use the following parts:
Position 2: 8 bolts M12x40
Position 3: 8 nuts M12
Position 5: 1 pin ø30x118
Position 6: 2 washers ø23-50x4
Position 7: 2 nuts M22
Position 8: 1 pin ø30x142
Summary of Contents for TR/11
Page 1: ...ASSEMBLY USE AND MAINTENANCE HAY RAKE PULL TYPE TR 11 13 S ...
Page 29: ...28 Step 19 ...
Page 30: ...29 Step 19 ...
Page 33: ...32 Step 21 ...
Page 37: ...36 6 GENERAL MAINTENANCE INSTRUCTIONS ...
Page 39: ...38 ...