![sitrex TR/11 Assembly, Use And Maintenance Download Page 31](http://html1.mh-extra.com/html/sitrex/tr-11/tr-11_assembly-use-and-maintenance_1285860031.webp)
30
Step 19
Insert pipes 1-2-3-4-5-6 in the proper places of sections 7-8-9-10-11.
The pipes can be inserted either from point A or from point B, following, however,
the order shown above. At the same time the bushings with chain 12 must be put
on the pipes (point X). To join pipe 1 to pipe 2, use pin C (already assembled by the
manufacturer), bolts 13 and nuts 14 (point Y). To join pipe 2 to pipe 3, use the
coupling pin 16, bolts 13 and nuts 14 (point K). To connect pipe 3 to pipe 4, insert
the piece of chain 17 inside the pipes and fasten with bolts 13 and nuts 14 (point
H). To connect pipe 4 to pipe , use pin D (already assembled by the manufacturer),
bolts 13 and nuts 14 (point J). To connect pipe 5 to pipe 6 (for TR/13 only), use pin
18, bolts 13 and nuts 14 (point W). At this point fasten the bushings with chain 12 to
the pipes at the position indicated using bolts 15.
IMPORTANT:
Once all this has been done, try to move the pipes manually forward and backward
(removing the plastic cap on the oil port of the rear cylinder to facilitate movement)
to see if everything has been assembled correctly. This is to avoid – in the case of
incorrect assembly or wrong parts – causing damage to the structure when you go
to actuate the cylinder with the tractor oil.
In this step use the following parts:
Position 13: 10-14 bolts M8x45 (0.31”x1.77”)
Position 14: 10-14 nuts M8 (0.31”)
Position 15: 11-13 bolts M10x25 (0.39”x1”)
Summary of Contents for TR/11
Page 1: ...ASSEMBLY USE AND MAINTENANCE HAY RAKE PULL TYPE TR 11 13 S ...
Page 29: ...28 Step 19 ...
Page 30: ...29 Step 19 ...
Page 33: ...32 Step 21 ...
Page 37: ...36 6 GENERAL MAINTENANCE INSTRUCTIONS ...
Page 39: ...38 ...