
...............................................................................
HEM MACHINE
3
INTRODUCTION
A.
Install & Debug & Test
1.
Ventilation test.
Connect the ventilation source, open the total valve
switch, confirm that there is no leakage sound, and each
cylinder has been ventilated and the initial state is correct,
if not correct, please adjust the vent hole.
2.
POWER switch Test.
Plug in and turn on the power-on switch to see if the
machine starts properly. Turn off the power-on switch to
see if the machine shuts down properly.
3.
Solenoid valve Test.
Connect the ventilation source and power, boot press the
language selection key of the homepage, enter the main
interface.
Press machine
Control key to enter machine
control interface.
Press
Electromagnetic
inspection key into the
Solenoid valve test Interface
(P19, reference solenoid valve
detection Interface).
Summary of Contents for ASC-TBH100A
Page 1: ...ASC TBH100A ELECTRONIC CONTROL PARAMETER MANUAL...
Page 4: ...3 1 2 3 P19...
Page 5: ...4 4 P20...
Page 6: ...5 5...
Page 7: ...6 6 P21...
Page 8: ...7 7...
Page 9: ...8 8...
Page 10: ...9 9 P25 10 P15 11...
Page 11: ...10...
Page 12: ...11 12 P16...
Page 13: ...12 P29 13 Y 14 15 13 16...
Page 14: ...13 3 13 17 P16 5 18 P17 6 19 P17 7...
Page 15: ...14 1 1 2 B A C D 3 E A B C D A B C D A B C D E...
Page 16: ...15 2 1 1 2 3 4 5 100 6 100 7 8 9 10 11 12 13 14 15 16 17 18...
Page 17: ...16 19 20 21 22 23 24 25 26 1 2 3 Y 4 5...
Page 18: ...17 6 7 8 A B C D 2 3 B C D E A...
Page 19: ...18 4...
Page 21: ...20 J11 J1 2 J9 4 J10 X X Y Y Z U W W Z U U V...
Page 22: ...21 A B C D E A B C D E A B X Y C D ADC E W W A C B D E...
Page 23: ...22 5 U LOGO 1024x600 U MCU APP 1111...
Page 24: ...23 1234 123456 1 01 4000 1 02 400 1 03 800 1 04 1200 1 05 4 XY 1 06 XY 13 XY 1 07 0 0...
Page 26: ...25 1 43 4 5 1 44 10 1 45 mm 5 00 1 46 300 1 47...
Page 27: ...26...
Page 28: ...27 U U 1024x600 bmp LOGO U U U...
Page 29: ...28 U U...
Page 30: ...29...
Page 32: ...31 1 2 3...