Page 15
Rubber Washer
2.2 GENERAL RECEIVING INSPECTION
Only QUALIFIED SERVICE PERSONNEL should carry out inspection.
All Simuline products are manufactured so that operation is possible immediately after the
proper installation. However, it can be possible that an irregular situation occurs during
transport and delivery to prevent this. To verify that transport and delivery has be carried
out without irregularity, a proper general receiving inspection should be made as follows:
l
Are then any dented parts or defects (cuts, etc.) on the external surfaces of the
product?
l
Are castors and leg adjusters present and undamaged?
l
Do the power supply voltage and frequency requirements match with the local supply?
l
Are all wiring connectors correctly and securely connected? Unless connected in the
correct direction, connector connections cannot be made successfully. Do not insert
connectors forcibly.
l
Are all IC’s of each IC board firmly inserted?
l
Does the power cord have any cuts or dents?
l
Do fuses meet the specified rating?
l
Are such units such as monitors, control equipment, IC boards, etc. firmly secured?
l
Are all earth wires connected?
l
Are all accessories available?
l
Can all doors and lids be opened with the accessory keys and/or tools?
Summary of Contents for Cycraft
Page 16: ...Page 16 3 NAMES OF MAJOR PARTS 18 11 12 13 14 15 16 17 28 ...
Page 30: ...Page 30 Hexa bolt M8 x 30L DU Bush 10 15 Rubber Washer 11 20 3t Spring Washer Flat Washer ...
Page 73: ...Page 73 10 2 Cabin Schematic SCHEMATIC 2 HERE ...
Page 74: ...Page 74 10 3 MCU Schematic DOCUMENT END SCHEMATIC 3 HERE ...