Table of contents
INTRODUCTION....................................................................... 5
Purpose...............................................................................................................................6
Personnel and location .......................................................................................................6
Referenced documents .......................................................................................................6
Tools and test equipment ...................................................................................................7
ACCEPTANCE TEST SUMMARY .................................................. 8
HARDWARE AND SOFTWARE REGISTRATION .......................... 9
Verification of previously tested items.............................................................................10
Software items ................................................................................................................. 11
Hardware items ................................................................................................................12
Display....................................................................................................................12
Processor Unit ........................................................................................................12
Transceiver Unit .....................................................................................................13
Operating Panel ......................................................................................................14
Hull Unit.................................................................................................................15
Transducer ..............................................................................................................16
VISUAL INSPECTION ............................................................. 17
Visual inspection of the display .......................................................................................17
Visual inspection of the Processor Unit ...........................................................................19
Visual inspection of the Operating Panel.........................................................................21
Visual inspection of the Transceiver Unit........................................................................22
Visual inspection of the hull unit .....................................................................................24
Environmental inspection of the Transceiver Unit ..........................................................26
Making sure that all SU90 cables are properly connected...............................................27
TESTING THE SU90 OPERATIONAL FUNCTIONALITY ............. 29
Bridge steps ............................................................................................................30
Sonar room steps ....................................................................................................32
Testing the user interface to verify basic functionality ....................................................34
Verifying SU90 operation by means of the BITE functionality ......................................35
TESTING THE INTERFACES WITH PERIPHERAL DEVICES ....... 40
Verifying the communication with a navigation system (GPS).......................................40
Verifying the communication with speed log ..................................................................42
Verifying the communication with the course gyro.........................................................44
Verifying the communication with the motion reference unit (MRU) ............................46
VERIFYING THE INSTALLATION PARAMETERS ...................... 49
Harbour Acceptance Test