Testing the user interface to verify basic
functionality
A functional test is done with the SU90 system assembled as a complete product.
Prerequisites
The SU90 has been set up with its hardware units connected as specified in the SU90
Installation manual
.
• The SU90 system is turned on and operates normally.
• The SU90 is in
Normal
mode, but
TX Power
is set to
Off
to prevent transmissions.
• The transducer is retracted to its upper position.
• The vessel is berthed.
Neither tools nor instruments are required.
Caution
You must never set the SU90 to "ping" unless the transducer is submerged in water.
The transducer may be damaged if it transmits in open air.
Procedure
1
Make sure that the SU90 user interface is fully operational.
a
Make sure that the SU90 visual presentation is shown with adequate quality.
If necessary, adjust the display and/or the relevant properties in the Processor
Unit operating system.
b
Make sure that the Operating Panel is functional.
Press and/or turn each button, and make sure that the corresponding function is
activated in the user interface.
c
Make sure that the menu system offered by the SU90 is operational.
Make random selections, and make sure that the relevant sub-menus, functions
or dialog boxes are activated.
d
Make sure that the relevant views are operational.
Move the cursor to the views in the main SU90 presentation. Click inside one
of the views. Make sure that the view is activated, and that relevant changes
are made in any dynamic menus.
e
If relevant, connect a computer mouse to the Processor Unit.
Make sure that the computer mouse works in the SU90 user interface. Make
random selections, and make sure that the relevant sub-menus, functions or
dialog boxes are activated.