
14. Connection Diagrams
3-PHASE 4-WIRE UNBALANCED LOAD
DIGITAL METERING SYSTEM
2 5 8 11 1 3 4 6 7 9
13 14
L N
AUX
SUPPLY
P1 S1
S1
P1
P1 S1
L1
L2
L3
N
L
O
A
D
3-PHASE 3-WIRE UNBALANCED LOAD
DIGITAL METERING SYSTEM
P1 S1
P1 S1
L N
AUX
SUPPLY
L1
L2
L3
N
L
O
A
D
2 5 8
3 4 6 7 9
13.4 Auxiliary Supply
The instrument should ideally be powered from a dedicated supply, however it may be powered
from the signal source, provided the source remains within the limits of the chosen auxiliary voltage.
13.5 Fusing
It is recommended that all voltage lines are fitted with 1 amp HRC fuses.
13.6 Earth/Ground Connections
For safety reasons, CT secondary connections should be grounded in accordance with local
regulations.
15. Specification :
System
3 Phase 3 Wire / 4 Wire programmable at site
60
Summary of Contents for Amik 300
Page 2: ...Cover Page 2...