
80
007-4564-001
3: Maintenance and Upgrade Procedures
Figure 3-20
Connecting the Cables and Retention Strap
3. Ensure that the IO9 board is properly aligned in the PCI gate. Then close the gate
and install the three screws that secure it to the enclosure (see Figure 3-21).
Figure 3-21
Closing the PCI Gate
This completes the installation of the IO9 board. To return the workstation to service,
refer to “Returning the Workstation to Service” on page 57.
IDE connector
SCSI connector
IO9 retention strap
R
R
R
R
R
R
R
R
R
R
R
R
R
R
Summary of Contents for Tezro
Page 3: ...007 4564 001 iii Record of Revision Version Description 001 July 2003 Original Publication ...
Page 4: ......
Page 9: ...Contents 007 4564 001 ix Lithium Battery Compliance Statement 147 Index 149 ...
Page 10: ......
Page 14: ......
Page 16: ......
Page 22: ......
Page 42: ...20 007 4564 001 1 Installation and Operation Procedures Figure 1 20 Restart Notifier ...
Page 44: ......
Page 68: ......
Page 81: ...Returning the Workstation to Service 007 4564 001 59 Figure 3 5 Installing the Bezel A B C D ...
Page 134: ......
Page 146: ......