Installing a Rack
007-4857-002
15
Transporting the Shipping Crate
Use a pallet jack with forks that are 48 in. (122 cm) long or longer to transport the shipping crate
to the designated location. See Figure 1-3 and Figure 1-4 for the crate dimensions and location to
position the pallet jack.
If the crate does not fit through all access doors, you may need to partially disassemble the crate.
Caution:
If the system shipping or storage environment is significantly colder than the
environment in which it will be installed [40
º
F (22
º
C) or greater disparity], leave the rack in its
shipping crate for at least 24 hours at room temperature before you start the installation. This
acclimation prevents damage to the equipment that could result from thermal shock and
condensation.
!
Summary of Contents for SGI Altix 450
Page 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Page 4: ......
Page 14: ......
Page 16: ......
Page 128: ......
Page 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Page 164: ......
Page 186: ......