10
007-4857-002
1: System Installation
For international sites, follow these steps to ensure that a single-phase power receptacle is properly
wired:
1.
Set the voltmeter to a high AC voltage range.
2.
Check the voltage between socket 1 and socket 2 (see Figure 1-2). The meter should read
between 200 and 240 VAC.
3.
Check the voltage between socket 1 (line) and the ground socket. The meter should read
between 200 and 240 VAC.
Note:
The ground pin is slightly larger in diameter than the other two pins.
4.
Check the voltage between socket 2 (neutral) and the ground socket. The meter should read
approximately 0 VAC.
5.
Check the voltage between the ground socket and an earth-ground location. The meter
should read 0 VAC.
6.
Change the voltmeter to a low-resistance setting.
7.
Measure between the ground socket and an appropriate earth-ground location and ensure that
resistance is less than 1 ohm.
8.
Repeat steps 1 through 7 for any additional single-phase power receptacles.
Caution:
If a voltage reading is incorrect, or if the resistance measured in step 7 is more than 1
ohm, contact a site-approved electrician. Do not proceed with the installation.
!
Summary of Contents for SGI Altix 450
Page 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Page 4: ......
Page 14: ......
Page 16: ......
Page 128: ......
Page 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Page 164: ......
Page 186: ......