EH-1200F Installation Manual
Page 52
1.
No ARQ losses on the RF Statistics counters.
4.1.4
Ethernet Services Test
This inspection verifies correct Ethernet services flow and error-free operation.
1.
Connect PCs on both ends of the link and use software-based utilities to test for
packet-loss.
2.
If available, connect a packet analyzer to the GbE port and verify that no packets
are lost.
4.1.5
Management Verification
This inspection verifies proper management of the link.
1.
Verify correct management/CLI connection to both local and remote ODUs .
2.
Verify management access from remote NMS stations.
4.1.6
Recording ODU Configuration
Perform the following steps after the EtherHaul ODU is commissioned and accepted:
1.
Copy the Running Configuration (currently active) to Startup Configuration.
2.
Save the configuration file for future records and backup.
4.2
EtherHaul Commissioning and Acceptance Form
EtherHaul™ Commissioning and Acceptance Form
Customer Details
Customer
Project/link name
Physical Installation Verification
Local Site
Remote Site
Site name & address
Mount type
Roof-top
Mast/Tower
Other______________
Roof-top
Mast/Tower
Other______________