21
3
Ratio of
the voltage
transformer
tr_U
0.1 ...
4000.0
1
4
Synchroniza-
tion of mean
active power
Syn
15, c_15,
c_30,
c_60
Synchronization of mean active
power:
15 - 15 minutes’ walking window
(record synchronized with the clock
every 15 minutes)
c_15 – measurement synchronize
with the clock every 15 minutes.
c_30 – measurement synchronized
with the clock every 30 minutes,
c_60 – measurement synchronized
with the clock every 60 minutes,
15
5
Storage of
minimum
and maxi-
mum values
with errors
erLI
oFF, on
oFF – storage of only correct values
(from the measuring range).
on – storage of also error occurren-
ces in measurements (values in
registers 1e20 and 1e20)
on
Item
Parame
-
ter name
Desi- gnation
Range
Notes/ descrip
-
tion
Manufac-
turer’s value
1
Introduction
of the ac-
cess code
SEc
oFF,
1 ...
60000
0 - without code
0
2
Ratio of
the current
transformer
tr_I
1 ...
10000
1
Table 3
6.5.1 Setting of Meter Parameters
Select the
PAr
mode in options (by or push-buttons)
and approve the choice by the push-button.
Summary of Contents for ND20LITE
Page 2: ...2 ...
Page 4: ...4 ...
Page 18: ...18 6 4 Operating modes Fig 6 Operating modes of the ND20LITE meter 7 ...
Page 27: ...27 a n on b n off ...
Page 63: ...63 ...