
Connecting
5.5 Sensor Installation
FUE1010 IP65 NEMA 4X
68
Operating Instructions, 12/2014, A5E03086491-AC
10.Disassemble the spacer bar and the unmounted frame. Use the bar as a straight edge
and, with one edge against the mounted frames tapered roller center and the other
crossing the dot you drew, draw a line crossing the dot (see "B" above). Set the bar
aside.
①
Trim material from inner edge if necessary
②
Mylar Spacing Guide
③
8cm (3-inch) Overlapping Edge
Figure 5-17 Wrapping the Mylar Spacing Guide around the pipe (End View)
11.Wrap the Mylar spacing guide around the pipe so that the left edge is against the sensor
edge mark (see "C" above). Arrange so that one end overlaps the other by at least three
inches. Trim to fit if necessary, but be sure not to trim at the overlapping end in order to
keep it square.
12.Realign left edge of the guide with the sensor edge mark. Line up both vertical edges of
the guide and ensuring that it is snug around the pipe, mark along the overlapping edge.
13.Remove Mylar spacing guide and lay it out on a flat surface. Either measure the exact
distance half-way between the overlap edge and the mark at the overlap, or fold the
guide from the overlap edge to overlap mark and draw a line at the fold or halfway point.
①
Overlap Edge
③
Spacing Guide
②
Mark (or fold) exactly at half-way point
④
Circumference
Figure 5-18 Finding the Halfway Distance
14.Reinstall the spacing guide; its left edge abutting the sensors edge mark on the pipe and
the overlapping edge in line with the dot (now a line) on the pipe (see "C). Tape it in this
position on the pipe. Take the second frame and place it against the edge of the guide
with its tapered roller centered on the center mark on the guide.
Summary of Contents for SITRANS 7ME3500
Page 2: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 243: ......
Page 244: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ...21614 C 1011NFPS 7 ...
Page 255: ...1011NFPS 7 C 21614 ...
Page 256: ...1011NFPS 7 C 21614 ...
Page 257: ...21614 C 1011NFPS 7 ...
Page 258: ......
Page 259: ......
Page 260: ......
Page 261: ......
Page 262: ......
Page 263: ...21614 C ...
Page 264: ......
Page 265: ......
Page 266: ...1012TN 7 INSTALLATION DRAWING 1010 SERIES TRANSDUCERS AND MOUNTING TRACKS 21614 C ...
Page 267: ...1012TN 7 INSTALLATION DRAWING 1010 SERIES TRANSDUCERS AND MOUNTING TRACKS 21614 C ...
Page 268: ...1012TNH 7 INSTALLATION DRAWING 1010 SERIES TRANSDUCERS AND MOUNTING TRACKS 21614 C ...
Page 269: ...1012TNH 7 INSTALLATION DRAWING 1010 SERIES TRANSDUCERS AND MOUNTING TRACKS 21614 C ...
Page 270: ......
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ...21614 C STEP 4 BAND LENGTH TABLE PERMANENT INSTALLATION SERVICE NOTE STEP 2 STEP 3 STEP 1 ...
Page 277: ......
Page 278: ......
Page 279: ......
Page 280: ......
Page 282: ......
Page 290: ...Glossary FUE1010 IP65 NEMA 4X 216 Operating Instructions 12 2014 A5E03086491 AC ...
Page 294: ...Index FUE1010 IP65 NEMA 4X 220 Operating Instructions 12 2014 A5E03086491 AC ...
Page 295: ......