Preparing for Operation
43
SIPART PS2 Manual
A5E00074631--06
M8, 14 deep (4x)
23
129.5
∅
8 h9
3.5
235,3
60
M6, 11 deep (4x)
All air connections
G
1/
4
or
1
/
4
”NPT
7.5
25.7
14,3
1)
M6, 8 deep (2x)
M20, M25 or
1/
2
”NPT (2x)
87.2
65
43
7.75
50
∅
∅
136.5
34
25
4.5
10.25
19,25
33.5
33.5
7
12
E
82,5
158.5
1)
Connection 238/Y2 only
in double action version
Figure 3-4
Dimensional drawing for positioner with metal housing in explosion proof
version 6DR5xx5
3.3 Assembly
!
WARNING
To avoid injury or mechanical damage to the positioner/mounting kit,
the following order must be observed for assembly:
1. Mechanical fitting of positioner
this chapter
2. Connection of electric power supply
see chapter 3.4, p. 57
3. Connection of pneumatic power supply see chapter 3.5, p. 71
4. Put into operation
see chapter 3.6, p. 72
Please also observe the warning on page 58!
General
Summary of Contents for SIPART PS2 6DR50 Series
Page 40: ...Design and Functional Principle 40 SIPART PS2 Manual A5E00074631 06 Table 2 1 Scopetuator ...
Page 88: ...Preparing for Operation 88 SIPART PS2 Manual A5E00074631 06 ...
Page 96: ...Operation 96 SIPART PS2 Manual A5E00074631 06 Figure 4 6 Parameter table of the positioner ...
Page 144: ...Operation 144 SIPART PS2 Manual A5E00074631 06 ...
Page 160: ...Appendix 160 SIPART PS2 Manual A5E00074631 06 ...