D.1
Switching on
Table D-1
Items to check during switch-on
Items to check during switch-on
O.K. Comment
Machine started without load for a short period "Start motor"
Direction of rotation checked
When running down from mechanical operation, noises and vibrations at the bear‐
ings and bearing shields checked.
Machine started again and run up to maximum permissible speed - smooth running
checked
With machine running satisfactorily, cooling system switched on
Machine monitored for a while in idling operation
With satisfactory idling performance, load connected to machine
Smooth running checked
Values for voltage, current and output logged
As far as possible, the corresponding values for the working machine are logged.
Temperatures of the bearings, windings, etc., monitored and logged until the sys‐
tem reaches a steady state.
Operating time reduced accordingly if the water-to-water cooler (if installed) is not
operated at this "preliminary" dry run stage.
Note:
Date
Name
Signature
Checklists
D.1 Switching on
SIMOTICS DC 1GH5
120
Operating Instructions 02/2016
Summary of Contents for SIMOTICS DC 1GH5
Page 2: ...08 02 2016 10 31 V4 00 ...
Page 12: ...Introduction 1 1 About these instructions SIMOTICS DC 1GH5 12 Operating Instructions 02 2016 ...
Page 50: ...Assembling 5 3 Installing the machine SIMOTICS DC 1GH5 50 Operating Instructions 02 2016 ...
Page 76: ...Operation 8 9 Faults SIMOTICS DC 1GH5 76 Operating Instructions 02 2016 ...
Page 98: ...Maintenance 9 2 Repair SIMOTICS DC 1GH5 98 Operating Instructions 02 2016 ...
Page 110: ...Spare Parts 10 7 Speed sensor SIMOTICS DC 1GH5 110 Operating Instructions 02 2016 ...
Page 114: ...Service and Support SIMOTICS DC 1GH5 114 Operating Instructions 02 2016 ...
Page 118: ...Quality documents SIMOTICS DC 1GH5 118 Operating Instructions 02 2016 ...
Page 128: ...Index SIMOTICS DC 1GH5 128 Operating Instructions 02 2016 ...
Page 129: ......