86 / 143
Siemens
Web Server OZW672... V6.0
CE1C5712en
Building Technologies
"Energy indicator" function
2015-10-13
6.3.5 Activating "Data point monitoring"
Monitoring "Energy indicator" data points is activated automatically following device
list creation.
Data point monitoring can thus be activated only following deactivation; see
Section 6.3.4.
·
Activation for "Data point monitoring" requires "Administrator" access rights.
The checkbox in the "Energy indicator" column allows for activating monitoring
of one or multiple data points e.g. following temporary deactivation.
Data point monitoring deactivated (by user)
Data point monitoring activated
Selecting the checkbox activates the data points for the selected device.
Selecting the summary checkbox (green/red, bottom row) activates the data
points for the plant.
Selecting the checkbox activates the data points for the selected partial plant.
Monitoring is deactivated for partial plant " Cooling circuit 1". As a result, all data
points are deactivated.
"Cooling circuit 1" is deactivated.
"Monitored data points" 0 of 2.
Data points "Cooling circuit 1" are deactivated.
Selecting the checkbox for partial plant "Cooling circuit 1" activates it. As a result,
all data points at the "Data points" level are also activated.
"Cooling circuit 1" is reactivated.
All data points of "Cooling circuit 1" are
reactivated.
Activation
"Plant" level
"Partial plants" level
Example