Technical Instructions
LMV Series
Document No. LV3-1000
Appendix A
Page 22
SCC Inc.
Purge Proving
Introduction
Purge proving verifies either a differential air pressure switch or an air damper end switch is in
the correct position before purge begins. This can be accomplished in two different ways:
•
A differential pressure switch to verify proper air flow through the boiler. Once the
proper differential pressure is achieved, the prepurge position has been verified and the
purge begins.
•
An end switch on the air damper. Once the air damper has moved to its fully open
position, the end switch closes and the purge begins.
The following procedure for purge proving on the LMV3 uses an additional two-pole relay with
either a differential pressure switch or an air damper end switch.
Procedure
The following procedure uses either a differential pressure switch or an air damper end switch
for purge proving on the LMV3. For the rest of this procedure, either switch will be referred to
as a “proving switch”.
1.
Wire the LMV3, proving switch, and two-pole relay as shown below in Figure 11.
Figure 11: LMV3 Purge Proving Wiring Diagram
Summary of Contents for LMV3 series
Page 1: ...Combustion Controls LMV3 Linkageless Burner Management System www scccombustion com ...
Page 2: ...Intentionally Left Blank ...
Page 41: ...LMV Series Technical Instructions Document No LV3 1000 SCC Inc Page 13 Section 2 ...
Page 42: ...Technical Instructions LMV Series Document No LV3 1000 Section 2 Page 14 SCC Inc ...
Page 43: ...LMV Series Technical Instructions Document No LV3 1000 SCC Inc Page 15 Section 2 ...
Page 44: ...Technical Instructions LMV Series Document No LV3 1000 Section 2 Page 16 SCC Inc ...
Page 45: ...LMV Series Technical Instructions Document No LV3 1000 SCC Inc Page 17 Section 2 ...
Page 46: ...Technical Instructions LMV Series Document No LV3 1000 Section 2 Page 18 SCC Inc ...
Page 223: ...Intentionally Left Blank ...