86
LE4010-CF & TL300-CF Power Supply Wiring Configuration
(Reference from DSC Installation Manual)
The ACT shall be connected to Input 1 of the transmitter and transmission delay is to be
configured via CONNECT 24.
The LBT and TEST shall be connected to FACP’s trouble inputs. The
outputs are active
low (switched to ground) and shall be connected via listed supervision relay (suggested
model: DSC, RM-2 or RM1C).
firealarmresources.com
Summary of Contents for FC2005
Page 5: ...firealarmresources com ...
Page 33: ...28 FC2005 Enclosure Mounting Pictures firealarmresources com ...
Page 48: ...43 firealarmresources com ...
Page 58: ...53 This page is left intentionally blank firealarmresources com ...
Page 89: ...84 LE4010 CF Configuration Reference from DSC Installation Manual firealarmresources com ...
Page 90: ...85 TL300 CF Configuration Reference from DSC Installation Manual firealarmresources com ...