7
Smart Infrastructure
A6V10393190_h_en_--
2019-09-01
1
About this document
Goal and purpose
The information provided in this manual is a summary of the key procedures and
functions required to assemble, install, operate, commission and repair the system.
It is intended to provide experienced and qualified personnel a guide on the required
processes.
Scope
The technical manual applies to the Cerberus FIT fire control panel FC12x series.
Target groups
The information in this document is intended for the following target groups:
Target group
Activity
Qualification
Installation personnel
Assembles and installs the product
components at the place of installation.
Carries out a performance check
following installation.
Has received specialist training in the
area of building installation technology or
electrical installations.
Commissioning personnel
Configures the product at the place of
installation according to customer-
specific requirements.
Checks the product operability and
releases the product for use by the
operator.
Searches for and corrects malfunctions.
Has obtained suitable specialist training
for the function and for the products.
Has attended the training courses for
commissioning personnel.
Maintenance personnel
Carries out all maintenance work.
Checks that the products are in perfect
working order.
Searches for and corrects malfunctions.
Has obtained suitable specialist training
for the function and for the products.
Document identification
Position
Information
Title page
Product picture
Product type
Product designation
Document type
Footers
Pages
Document ID
Edition date
Last page
Document ID
Edition date
Manual
Register