
31
Siemens Building Technologies
Cerberus Division
E1481b
06.2000
12.3 Connection to LMS
Fig. 22 and Fig. 23 show how to connect the GW-21 UARTs 3,4, 5, 6 on the screw ter-
minal of the connection board to the LMS for a 9 pin connector and a 25 pin connector
respectively.
Fig. 24 and Fig. 25 show how to connect the GW-21 UARTs 1 and 2 on the two DB9
connectors of the connection board to the LMS for a 9 pin connector and a 25 pin con-
nector respectively.
If there is only one LMS operating station, it can be connected to any UART among
those available. However, if there are two Operating Stations, they must be connected
to UARTs 1 and 2.
TX
RX
GND
1 1 32 31
4 4 34 33
2 2 36 35
GW-21
LMS (PC)
Female connector
Fig. 22 Connection to 9 pin D connector (screw terminal block)
RX
4 4 34 33
TX
GND
1 1 32 31
2 2 36 35
GW-21
LMS (PC)
Female connector
Fig. 23 Connection to 25 pin D connector (screw terminal block)
Summary of Contents for Cerberus GW-21
Page 4: ......
Page 41: ...37 Siemens Building Technologies Cerberus Division E1481b 06 2000 ...
Page 42: ......