25
Siemens Building Technologies
Cerberus Division
E1481b
06.2000
9.3
Example no. 1
In this first example we configure the gateway to connect to it one STT with master and
slave lines, two LMS, one standard subsystem and one CMX, in this way:
§
1st central station LMS
UART 1
§
2nd central station LMS
UART 2
§
STT first line
UART 3
§
STT second line
UART 4
§
Standard
UART 5
§
CMX / CF9003
UART 6
Please note that in this example the two lines are not physically contiguous (they are on
UART 1 and 4) but they are logically contiguous (the network addresses are 0 and 1)
The DIL-Switch settings are as follows:
DIL-Switch
subsystem
network address
S1-4
ON
S1-5
ON
UART 1
S1-6
ON
LMS
S2-2
ON
S2-3
ON
UART 2
S2-4
ON
LMS
S2-8
ON
S3-1
OFF
UART 3
S3-2
OFF
STT first line (=CS11)
0
S3-6
ON
S3-7
OFF
UART 4
S3-8
ON
STT second line (=STT)
1
S4-5
OFF
S4-6
ON
UART 5
S4-7
ON
Standard
2
S5-3
ON
S5-4
ON
UART 6
S5-5
OFF
CMX / CF9003
3
Tab. 13