21
Siemens Building Technologies
Cerberus Division
E1481b
06.2000
7.2
Example no. 2
In this second example, the gateway is configured for four subsystems and two moni-
toring stations:
§
first central station LMS (master)
UART 1
§
second central station LMS (slave)
UART 2
§
4 subsystems
CS11
UART 3
§
CS11
UART 4
§
CS4
UART 5
§
CS4
UART 6
Setting of DIL-Switches:
DIL-Switch
subsystem
network address
S1.4
ON
S1.5
ON
UART 1
S1.6
ON
LMS master
S2.2
ON
S2.3
ON
UART 2
S2.4
ON
LMS slave
S2.8
ON
S3.1
OFF
UART 3
S3.2
OFF
CS11
0
S3.6
ON
S3.7
OFF
UART 4
S3.8
OFF
CS11
1
S4.5
OFF
S4.6
ON
UART 5
S4.7
OFF
CS4
2
S5.3
OFF
S5.4
ON
UART 6
S5.5
OFF
CS4
3
Tab. 11
Remember that when your system needs two LMS stations, you must configure them
using UART 1 (as a
master station
) and UART 2 (as a
slave station).