7SG16 Ohmega 402 60 Commissioning
©2010 Siemens Protection Devices Limited
Chapter 9 Page 9 of 19
4.1.2 Operating Time Test
Using a test set with a constant source impedance model, and an SIR of
≤
30, apply phase faults and earth faults
to the relay inside each of the zones of protection, on the line angle.
Check and record Zone 1, 2, 3 operating times for faults in the middle of reach zones.
Element
Time Delay
Settings
Fault
Type
Applied
Impedance (
Ω
)
Measured Operating
Time (ms)
A-E
B-E
Earth Fault
= ms
C-E
A-B
B-C
Zone 1
Phase Fault
= ms
C-A
A-E
B-E
Earth Fault
= ms
C-E
A-B
B-C
Zone 2
Phase Fault
= ms
C-A
A-E
B-E
Earth Fault
= ms
C-E
A-B
B-C
Zone 3
Phase Fault
= ms
C-A
Check operating time is
≤
50ms for SIR
≤
30
Checked
OK