Transport, storage and packing
10
9229 9860 176 0E
2013-08-22
Unpacking (II)
Variant with brackets
Remove carton as described in Fig. 1 and Fig. 3.
Working equipment
Required tools:
-
Knife/scissors
-
Screwdriver
-
Open-end wrench
-
Lifting equipment with lifting gear.
Transporting with brackets
•
Remove partitions and accessory pack and store safely in the packaging for
later attachment.
•
Attach suitable bolt in the middle pole head.
•
Attach sling gear to bolt and to transport boreholes.
Fig. 10
Removing partitions and film
Fig. 11
Lifting the vacuum circuit-breaker
Summary of Contents for 3AH3
Page 4: ...4 9229 9860 176 0E 2013 08 22 Blank page ...
Page 16: ...Transport storage and packing 16 9229 9860 176 0E 2013 08 22 Blank page ...
Page 52: ...Operation 52 9229 9860 176 0E 2013 08 22 Blank page ...
Page 58: ...Maintenance 58 9229 9860 176 0E 2013 08 22 Blank page ...
Page 60: ...Index of keywords 60 9229 9860 176 0E 2013 08 22 Blank page ...
Page 62: ...62 9229 9860 176 0E 2013 08 22 Blank page ...
Page 63: ...9229 9860 176 0E 63 2013 08 22 Blank page Siemens Parts ...