13
5630
6
2019
-
SX35 & SX50
MG_0112
Align two ends of the tunnel.
Push two tunnel
ends together.
Check snap lock
positions around the
tunnel.
Ensure top lips tabs
into the motor
inserts.
1
2
Tunnel Installation
EN
1. Ensure grids or cowls are installed if in use.
2. Connect both ends of the tunnel to the thruster motor. All hooks must be completely interlocked making the inside of the tunnel smooth.
(NB:
Ensure tunnel moulding around the gear leg and tunnel top align.)
MC_0074
!
Please refer to the graphic for special considerations relating to your model
!
IMPORTANT
Ensure all snap-lock positions are correctly connected into place.
MG_0113
130 mm
5,12”
65 mm
2,56”
35,80 mm
1,41”
50 mm
1,97”
Drill holes in hull
Hole size
for hull
Sealant (MS Polymer)
Thruster and attachment bolts
18 mm
0,71”
+15% compression
Bolt and Washer
Hull thickness
Maximum hull thickness
is 50 mm or 150mm
Cover the
entire surface
1 - 3
6
7 - 8
4 - 5
Motor Installation
EN
1. Defi ne the location to install the thruster.
(NB: Ensure the thruster does not protrude past the transom profi le on any side and there is no
obstruction to the thrusters water fl ow. Also, check internally the thruster will not obstruct any objects.)
2. Mark the locations of the three drill holes using the defi ned measurements in this manual or from a template.
(NB: Maximum hull thickness is
50mm including optional spacer or 150mm for extended hull thickness models.)
3. Drill main hole, then two support bolt holes. Clean the area from dust for installation of the thruster.
4. Install a bolt and washer to ensure top bolts contact surface area is level with the main tube. Temporally place the thruster through the holes
to ensure correct fi tting. Using the cable leads from the thruster defi ne the location within the vessel for the installation of the control box.
(NB:
Ensure cables internally do not obstruct any objects. Do not place cables or control box close to high heat radiating parts EG. Turbo/
exhaust manifolds etc.)
5. Check the length of the compression rings. Compression rings must be longer than hull thickness to allow for compression
(NB: Cut compression
sealants to length top achieve 15% compression.)
5. The thruster assembly must sit fl ush on the transom. Grind and sand the area if required to ensure a secure fi t.
(NB: Use caution when grinding/
sanding surfaces as to not remove too much fi breglass.)
6. Ensure both bolts and washers to the support bars on the thruster are attached.
Apply a sealant (MS Polymer) to:
- the inside surface of the cutout holes on the hull.
-To the surface of the washer to the thread and
- in the recess of the main tube to the thread.
- 1cm deep inside all compression ring.
place all compression rings to bolt threads.
(NB: Ensure ample sealant (MS Polymer) around the bolts and centre tube for a watertight
fi tting.)
7. Insert the thruster with compression rings into the hole.
8. Fasten the thruster
MC_0074
!
Please refer to the graphic for special considerations relating to your model
!