14
5693
2
2019
-
SE60/185 S2
MC_0033
Checklist for DC and IP Thrusters
EN
�.......... Propeller is fastened correctly to the shaft.
�.......... Propeller turns freely in tunnel.
�.......... The anode holding screw is tightened well with thread glue.
�.......... Anti-fouling have been applied to the gearhouse and propeller but NOT on the anode or the
gearhouse lid where the propeller is fastened.
�.......... Correct drive direction as per controlpanel.
�.......... The bolts holding the gearhouse and motorbracket together are tightened correctly.
�.......... The bolts holding the motor to its bracket are tightened correctly.
The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.
Signed: .........................................................................................
Date: .............................................................................................
Extra pre-delivery tests by installer / yard who does not use other quality control systems !
Thruster type: ................................................................................................................................................................................................
Serial number:...............................................................................................................................................................................................
Date of delivery:.............................................................................................................................................................................................
Correct drive direction as per controlpanel: ..................................................................................................................................................
The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for fl ooding:
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
Other comments by installer: ........................................................................................................................................................................
.......................................................................................................................................................................................................................
.......................................................................................................................................................................................................................
......................................................................................................................................................................................................................