4.5
Testing plan
The safety relay must be thoroughly checked by appropriately qualified safety personnel
during commissioning, after modifications, and at regular intervals,
The regular thorough checks serve to assess the effectiveness of the safety relay and to
identify defects as a result of modifications or other influences (e.g., damage or manip‐
ulation).
The manufacturer and user must define the type and frequency of the thorough checks
on the machine on the basis of the application conditions and the risk assessment.
Determination of the thorough checks must be documented in a traceable manner.
4.5.1
Minimum requirements for the regular thorough check
The following thorough checks must be carried out at regular intervals:
•
Thorough check of the housing for damage
•
Thorough check of the cables for damage
•
Thorough check of the safety relay for signs of misuse or manipulation
•
Thorough check of the safety function
The required interval for performing these thorough checks depends on the applicable
safety capability of the overall application,
.
PROJECT PLANNING