Commissioning and Operation
FLOWSIC600-XT · Operating Instructions · 8018846/1BHP/V2-1/2021-05 · © SICK Engineering GmbH
91
Su
bje
ct to
ch
an
ge
w
ith
ou
t n
otic
e
4.3.2.8
Meter installation
Specifications on the installation conditions of the gas flow meter are relevant for trouble
-
shooting with i-diagnostics
TM
.
The arrow symbol on the gas flow meter shown identifies the primary flow direction.
Fig. 43
Installation conditions (example)
4.3.2.9
Completion
▸
First write the data to the device.
▸
If desired; Reset the malfunction volume encoder totalizer and clear the logbooks.
▸
SICK recommends creating a Parameter report and a Maintenance report and archiving
the reports with the delivery documentation,
.
4.4
Function check after commissioning
4.4.1
Recommended checks:
▸
▸
Checking the signal acceptance rate,
▸
▸
.
▸
Comparing theoretical and measured sound velocity (SOS),
NOTICE:
The data must be written to the device before the report is created otherwise
the reports are created using the data from commissioning.