Reel holding carriage (PW)
IDM 510-129-1
62
English language
Operation and maintenance manual
▀
Disassembly and re-assembly of the reel holding carriage
–
The operation must be carried out by the maintenance technician or by
personnel with suitable competences, skills and knowledge.
Make sure to fulfil the required requirements in order to work under safe
conditions.
–
This service should be carried out with the reel holding carriage lowered
and the machine safely at a stop.
1.
Mark the intervention area and
prevent access to the devices
that, if activated, may cause
unexpected hazards and jeop-
ardize the safety level.
2.
Set up a hook-shaped lifting
device with a suitable capacity.
3.
Loosen screws and remove
guard
A
.
4.
Hook the lifting device using
the eyelets.
5.
Disconnect all connectors from
their sensors.
6.
Disconnect the earthing cable.
7.
Loosen the screws
B
.
8.
Disassemble the reel holding
carriage
C
from the support
D
.
9.
Position the component in a
suitable place so that it does
not constitute any obstacle.
10.
Remove the lifting device.
Re-assembly of the reel holding
carriage
1.
Hook the lifting device using
the eyelets.
2.
Assemble the reel holding car-
riage
C
on the support
D
.
3.
Tighten the screws
B
.
4.
Connect the earthing cable.
5.
Connect the connectors to their
sensors.
6.
Remove the lifting device.
7.
Assemble the guard
A
, and then fasten it by using the screws.
–
At the end of operations, check that there are no tools or other material
near the moving parts or in dangerous areas.
8.
Start the machine and make sure that the operation has been carried out proper-
ly.
Summary of Contents for ProWrap 16_H_FM
Page 14: ...Safety information IDM 510 004 5 12 English language Operation and maintenance manual...
Page 84: ...Control system IDM 510 140 0 82 English language Operation and maintenance manual...
Page 102: ...Disposal and scrapping IDM 510 106 0 100 English language Operation and maintenance manual...