2
Preparing for installation– It is crucial that all installations are planned out carefully before
specifying a shade order.
For new construction or difficult installations, order and install the tracks first or utilize pre-construction
channels.
If pre-installing tracks, make sure the tracks are sealed from construction materials during construction.
Make sure that the tracks and the shade boxes can be installed securely, level, and plumb. Add appropriate
blocking or carpentry work before installing tracks and shades.
If drilling through the bracket is required, the bracket must be square or the door will not line up, causing
poor operation.
Electrical work should be performed following appropriate electrical codes and regulations by a licensed
electrical professional.
Use fasteners appropriate for the structure the Zen 2 shade will be mounted to.
Do not use any sharp blades when opening the packaging.
We recommend a pocket size of 7” W x 10” H.
Read the instructions in their entirety before proceeding. Actions contrary to the instructions invalidate
the warranty and may result in serious damage and/or injury.
BEFORE PROCEEDING