Page 16
STEP 10
ATTACHING THE PULLEYS
ITEMS
REQUIRED
1. Attach the PNF Pulleys (2 on each side) from the Towers Bag to the desired height.
2. Feed the rope through both Pulleys. (Pic 10.1)
3. Locate the Rope Cleat on both sides of the Carriage and secure the end of the Rope by
pushing it down and back into the Rope Cleat. (Pic 10.2)
10.1
10.2
Run the end
of the rope
w/out
handles
through the
pulleys
Summary of Contents for TNT
Page 2: ...Page 2 ...
Page 8: ...Page 8 3 1 3 2 3 3 3 4 3 4 ...
Page 10: ...Page 10 4 2 4 4 4 1 4 2 4 3 4 4 4 4 ...
Page 14: ...Page 14 TNT WITH TOWERS ONLY The following two steps are for the ...
Page 18: ...Page 18 ...
Page 20: ...Page 20 ...