54
Interventional Project
Steps
1.
Click on the “Interventional project” tab.
2.
Select the interventional project you want to bundle with this device.
3.
After selecting the project, click on the
button at the top to save the
interventional project settings
.
Repeating schedule every X month.
Steps
1.
Click on the “Every Month”
tab.
2.
Enter the number of month(s).
3.
Select the days you want to
the schedule to repeat.
4.
Click on the
button to
finish.