Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
0004205
Page 12 of 22
Rev 2.7 3/13/2018
Step # 11
– Attach Level Cables to Spacer Brace Tube
Insert the ends of the level cables (from the cradle tubes) directly up thru the space brace tube
and secure with hardware from chart below. Hint: Block the platform off the lower frame about
6 inches to create enough slack for the cable to pass thru the brace tube.
4000# - 5000# - 6000#
8,000# - 15,000#
Hoist Models
Hex Nut
Washers
Hex Nuts
Washers
SSV40108HS & HSDW
5/8-11
5/8
5/8-11
5/8
SSV40120HS & HSWD,
SSV50120HS
5/8-11
5/8
5/8-11
5/8
SSPV50132LHS
5/8-11
5/8
5/8-11
5/8
SSPV60120LHS &
SSV60120HS &HSDW
5/8-11
5/8
5/8-11
5/8
SSV60132HS
5/8-11
5/8
5/8-11
5/8
SSV80132HSDW
5/8-11
5/8 & A314*
5/8-11
5/8
SSV100132HSDW
5/8-11
5/8 & A314*
7/8-9
7/8
SSPV100144HSDW
5/8-11
5/8 & A314*
7/8-9
SSV150144HSDW
7/8-9
7/8 & 6767900*
1 1/8-7
Level Cable
Lift Cables
Step #12
– Install the Hydraulic Lift Tube/Assemblies
The lift tube contains the hydraulic cylinder and is quite heavy. You will need several people or
powered assist to lift and hold it in position until it is secured. Orient the lift tube on the side of
the lift with the corner cable brackets, the cables exiting the bottom and hydraulic ports to the
outside. Locate the brackets and hardware for your model as specified below. Locate the