20(44)
3.4 Hanging and Transporting of the Unit
1) Propose plans of hanging and transporting before practise, including entering
date for each unit, dimensions of appearance, weight, path, reserved holes,
hanging and transporting device as well. Figure 3-1 shows the details.
Table 3-1: Notice for Lifting Matters
Items
Check points
Transporting
Path
1. Check aisle, stair gate and transporting path.
2. Check roof, base room and hanging path.
Unload
1. Check the weight of the unit.
2. Prepare unload devices.
3. Check the temporary laying place and keep the unit clean.
Transporting
1. If the large-scale machine can be decomposed, then decompose
it and transport each part respectively and then combine them
finally.
2. If the large-scale machine cannot be decomposed, then dig hole
in the wall or earth to transport it.
Path adjustment
Adjust with the wall, floor to facilitate transporting.
Others
Arrangenent of labor and hanging device; problems of woker and
unit safety.
2) According to safety command, when hanging and transporting units, assign
special person to direct and there must be warning and precaution measures
to ensure safety of people and machines.
3) Consider the weight of the unit. Take woven belt as hanging device and add
bearing articles to avoid damage to metal board.Keep horizontal or vertical
state. It is forbidden the unit inclined by over 30 degrees.
4) Protect the unit from being cut or deformation.Place protective mat or wood
poles in the contact places between woven belt and the unit.
Picture 3-3: Hanging and Transporting of the Unit