19(44)
3.3 Bearing Platform
1) The unit should be installed on concrete or steel structure bearing platform
that is firm and the surface of the baring platform should be smooth and flat.
The in tensity of the platform should hold the whole unit, if the intensity is not
strong enough, it is easy to cause vibration and noise.
2) The surface of the concrete base platform normally has compo as horizontal
ornament and with waterproof treatment
,
the surrounding of it should have
drainage sink placed, and the slope angle should be no less than 0.5%
,
and
the slope should lead to drainage outlet.
3) Inorder to maintain quiet operation and prevent the vibration and noise
transmission from interfering the under floors
,
the absorber should be laid
between the unit base and base platform. Please maintain horizontal when
install the unit and mount anti vibration pad when it is necessary.
4) Inorder to keep connection pipe from being twisted to crack by earthquake,
typhoon, or by long time running caused movement. The fixation method
should be taken into consideration, refers to following examples for platform
installation and fixation
:
Picture 3-2: Platform Installation
Note : 1) Photo 3-2 the platform size is for module unit, pay special
attention to the real location and size of installation holes.
2) When adopts photo 3-3 showed fixation way, keep bearing bolt holes
for platform and its absorber as photo 3-2 showed installation hole
location.