61(61)
2) Check if the discharging plate is out of shape. If it is, please replace it.
3) Check the contact performance of magnetic proximity switch. If there is any
poor contact, place adjust it or replace it.
6.6 Maintenance Schedule
6.6.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.6.2 Installation & Inspection
Check if the takeover pipe has been correctly connected.
Check if that pipe is locked up by clips.
Check if mounting base is locked tightly.
Electrical Installation
Voltage: V Hz
Fuse melting current: One-phase: A Three-phase: A
Check phase sequence of power supply.
6.6.3 Daily Checking
Check main power switch.
Check filter mesh.
Check working status of the motor.
6.6.4 Weekly Checking
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check the screw of the feed-in pipe's flange is loosed or not.
Check the air filter.
6.6.5 Monthly Checking
Check the spring lock on the hopper cover is loosed or not.
Check the reversal stop piece is deformed or not.
Check the performance of magnetic proximity switch/photoelectrical sensor.
Summary of Contents for SAL-10HP-UGP
Page 1: ...SAL UGP Series Vacuum Powder Loader Date Apr 2013 Version Ver B English ...
Page 2: ......
Page 28: ...28 61 2 3 Electrical Diagram 2 3 1 Main Circuit 400V Picture 2 7 Main Circuit 1 400V ...
Page 29: ...29 61 Picture 2 8 Main Circuit 2 400V ...
Page 30: ...30 61 2 3 2 Electrical Components Layout 400V Picture 2 9 Electrical Components Layout 400V ...
Page 37: ...37 61 2 3 4 Main Circuit 230V Picture 2 10 Main Circuit 1 230V ...
Page 38: ...38 61 Picture 2 11 Main Circuit 2 230V ...
Page 39: ...39 61 2 3 5 Electrical Components Layout 230V Picture 2 12 Electrical Components Layout 230V ...