27
To be continued on next page
INSTALLATION
Installation of the shifting cable
3
(A)
(x)
(B)
(C)
(D)
(y)
(z)
After checking that the end of the outer
casing is sitting securely in the cable
adjustment barrel of the shifting lever,
attach the inner cable fixing bolt unit to
the inner cable.
Then, pull the inner cable while
attaching the inner cable fixing bolt unit.
(x)
10 mm
(y)
184 mm
(z)
75 mm or less
(A)
Inner cable fixing bolt unit
(B)
Inner cable fixing nut
(C)
Inner cable fixing washer (Black)
(D)
Inner cable fixing bolt (Black)
Tightening torque
3.5 - 5.5 N·m
NOTE
This inner cable fixing bolt unit is designed
only for CJ-S700. 7-step and 8-step fixing bolt
units cannot be used.
TECH TIPS
When installing the inner cable fixing bolt
unit, use the setting tool TL-S700-B.
4
(A)
Turn the lever of the pulley clockwise.
In the following steps 5 and 7, continue
to work in this condition.
(A)
Pulley lever
5
(A)
(B)
(z)
(y)
Bring the cable around to the cassette
joint pulley, hold it so that the inner
cable fixing nut is facing to the outside
(toward the fork end), and then slide the
flats part
(y)
of the inner cable fixing
washer into the gap
(z)
in the pulley.
(A)
Inner cable fixing nut
(B)
Pulley
Summary of Contents for Alfine S7000 Series
Page 9: ...LIST OF TOOLS TO BE USED ...
Page 11: ...INSTALLATION ...
Page 30: ...ADJUSTMENT ...
Page 34: ...MAINTENANCE ...