
5-4
5.2
Maintenance Flow
After maintenance service, works described in “(3) Work required after maintenance”
in "5.1 Maintenance and inspection items" may be necessary. The table below shows
the work necessary after each maintenance service.
Maintenance Item
Waste
discharge
Recalibration
Master curve
correction
Check
Analysis
Changing / adding
argon gas bubbler
water
►
X
►
O
►
Ø
►
O
Spark stand
maintenance
►
O
►
O
►
Ø
►
O
Exchanging
electrode O-ring
►
O
►
O
►
Ø
►
O
Cleaning the
condenser lens
►
O
►
O
►
Ø
►
O
Control gap
adjustment
►
X
►
O
►
Ø
►
O
Exchanging pump
oil
►
X
►
O
►
Ø
►
O
Entrance slit
adjustment
►
O
►
O
►
Ø
►
O
Lamp test
X
X
X
X
Recalibration
sample
replacement
►
X
►
O
►
Ø
►
O
Argon gas
replacement
►
O
►
O
►
Ø
►
O
File maintenance
X
X
X
X
Bad result value in
check analysis
►
X
►
O
►
Ø
►
O
O
: Always perform
Ø
: Perform if necessary
X
: Not necessary
Note
After each maintenance service, be sure to carry out waste discharge,
recalibration, master curve correction, and check analysis using the
sample for checking according to the table above.
Summary of Contents for PDA-7000
Page 2: ...This page is intentionally left blank...
Page 25: ...Chapter 1 Configuration and Function of the Instrument...
Page 36: ...1 Configuration and Function of the Instrument 1 12 This page is intentionally left blank...
Page 37: ...Chapter 2 Specification...
Page 43: ...Chapter 3 Starting and Stopping the Instrument...
Page 51: ...Chapter 4 Operation...
Page 65: ...Chapter 5 Maintenance...
Page 100: ...5 Maintenance 5 36 This page is intentionally left blank...
Page 101: ...Chapter 6 Installation...
Page 105: ...Chapter 7 Troubleshooting...