![Shimadzu OMRON CJ Series Network Connection Manual Download Page 39](http://html1.mh-extra.com/html/shimadzu/omron-cj-series/omron-cj-series_network-connection-manual_1256907039.webp)
7
.
Serial Communications Connection Procedure
36
5
Check that the network type is
set to USB in the Change PLC
Dialog Box. Click
OK
.
*If not, select
USB
from the
pull-down list.
6
Select Connect to PLC from the
PLC Menu.
7
Check that the PLC status
displayed next to the PLC Icon
changes from Offline to the
Program in the Project
Workspace.
It means that PLC is online.
*If the other operating mode
such as Monitor or Run is
displayed, change it to
Program by following step 8.
8
If the operating mode is Monitor
or Run in step 7, select
Operating Mode
–
Program
from the PLC Menu.
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
Yes
.
Check that the operating mode
changes to Program as shown
in step 7.
9
Double-click
New Protocol List
in the Project Workspace to
expand the tree.
Summary of Contents for OMRON CJ Series
Page 82: ...2020 0120 0120 P732 E1 01...