5
Chapter 3
System Debugging and Use
3.1
System debugging
After connection and verification, the system may be switched on for debugging, mainly
including logging and testing of detector and module, and setup of linkage relation.
3.2
System operating instructions
3.2.1 Functions of the panel
The layout of JB-QBL-9116E panel is as follows:
Figure 3-1 Layout diagram of the panel
The design of panel contains the basic functions of alarm enquiries and control. The
indication in the above figure is detailed as follows:
Indication function zone: