User’s Guide
HRP/S
-
25
-
HS
Alterations
9
9.3.2 Installation
1.
Disengage the air connection.
The top frame will now lower slowly as the air escapes.
2.
Clear a space of approximately 20 cm in the top frame by
moving other heating elements and/or pressure bars. (For
positioning see Section
8
).
3.
Place the heating element or the pressure bar diagonally in
the top frame and then slide it straight.
4.
Position the heating element or the pressure bar and
tighten the support bar clamps.
(Use socket screw key
no. 6
).
20cm
2
Support bar clamp
4
3