User’s Guide
HRP 220
-
26
-
HS
Alterations
9
9.3.2 Installation
1.
Disconnect the compressed air.
The top frame will now lower slowly as the air escapes.
2.
Clear a space of approximately 20 cm in the top frame by
moving other heating elements and/or pressure bars. (For
positioning see Section
8
).
3.
Place the heating element or the pressure bar diagonally in
the top frame and then slide it straight.
4.
Position the heating element or the pressure bar and
tighten the support bar clamps.
(Use socket screw key
no. 6
).
5.
Connect the wires to the terminals on either side of the
machine. Insert the fork terminal under the rotary knob
and tighten it firmly by hand.
(Only for heating elements).
Always use the same colour terminals on both sides of the machine.
Never use pliers. This could damage the terminals.
6.
Switch on the machine again as described in Section
7
.
20cm
Terminal
Fork terminal
5
2
Support bar clamp
4
3
Summary of Contents for HRP 220
Page 1: ...User s Guide English Plastic bending machine HRP 220...
Page 42: ...User s Guide HRP 220 41 HS Annex DIAGRAM CONTROL UNIT B...
Page 43: ...User s Guide HRP 220 42 HS Annex DIAGRAM TIMER UNIT C...
Page 44: ...User s Guide HRP 220 43 HS Annex MAIN SWITCH UNIT D...
Page 45: ...User s Guide HRP 220 44 HS Annex DIAGRAM PNEUMATIC SYSTEM E...
Page 46: ...User s Guide HRP 220 45 HS Annex DIMENSIONS F 1300 2590 1550 1720...