7 of 22
SECTION 2 INSTALLATION
2.1 General
WARNING: Toxic, corrosive or explosive gases must be handled with extreme care.
After installing the PC, the system should be thoroughly checked to ensure it is leak-free.
Purge the PC with a dry inert gas for one hour before using corrosive gases.
IMPORTANT: When installing the PC, ensure that the arrow on the back of the unit
in the same direction as the gas flow.
2.2 Unpacking
The PC100-D are assembled
,
calibrated and clean packaged under clean room
conditions. These series products are packaged with two separately sealed plastic bags. The
outside is common plastic bag, the inside is clean bag. The outside bag should be removed
in the entrance to the clean room. In order to minimize the contamination, the second clean
bag should be removed in the clean room when PC installed in the system.
2.3 Mechanical Installation
2.3.1 General
PC100-D should be mounted in the position accord with the requirement in the
purchase order. The gas should be clean and dry. The mounting should be free from shock
or vibration. The pictures of the product are shown in figure2-1,the dimensions of the
product are shown in figure2-2 and figure2-3. Different fittings(Compression Fitting1/4
and VCR1/4 M) are optional for customer, The length of the product L are shown in Table
2-1. Do not remove the protective end caps of the fittings until installation.