11
Step 2
While keeping
cord ends outside
the back box
pass-through
port, finish the
wall tight to the
edges of back
box, removing
any gap. Once
complete, the
final wall surface
should be flush
with the front
edge of the back
box as shown.
1) BACk BOx
MAINTAIN
CORDS
IN PASS-
THROUgH
PORT
DURINg
WALL
FINISHINg
FINISHED
WALL
FINISHED WALL
WALL BOARD
FRAMINg
MEMBER
SCREW
MOUNTINg
SLOTS
NOTE:
SURFACE OF
FINISHED
WALL AND
FRONT EDgE
OF BACk
BOx ARE
FLUSH
1) BACk BOx