Installation and Service Manual
11
INSTALLATION
TRIPLE TOWER PLUMBING
Water Flow Rate
Adjustment
Water Shut-off
Syrup Shut-off
Syrup Flow Rate
Adjustment
BRIXING PROCEDURE
NOTE:
This tower consists of two valves combined as one with a mixer block, mixer tube and mixer. One Pre-ME
valve (CMBEGKER) and one Flomatic 424 Flow Control Base
Set water flow rate first:
1. Turn off syrup shut-off at post-mix (424) valve block.
2. Use stop watch to time the dispense of soda water
only.
3. Dispense for 5 seconds.
4. Record volume in a volume cup or ratio cup.
5. Adjust the water flow rate as needed until 10 ounces
of water is measured in a 5 second (2 oz/sec) dis-
pense.
Set the syrup flow rate:
1. Adjust the ratio (brix) of water to syrup (4.75:1) or 12.3
to 12.7 brix)
2. Turn on syrup shut-off and turn off the water shut-off.
3. Use a stop watch to time the dispense of syrup only.
4. Dispense for 5 seconds.
5. Record volume in a volume cup or ratio cup.
6. Adjust syrup flow rate as needed until 2 ounces of
syrup is measured in a 5 second dispense.
7. Use a refractometer if possible to get final brix ratio of
12.3 to 12.7. You will have to rely on volume adjust-
ment above for diet products.